Prior to committing capital, hospitals considering refurbished medical equipment must be able to assure that full maintenance records exist and that the high wear items (sub-assemblies) of the equipment are still in good condition, and that software licensing rights have been confirmed. A rigorous technical evaluation guarantees secondary market systems are providing clinical accuracy without unexpected system failures or regulatory issues.
Part identification and part history
The past of any used clinical system is as vital as its outward appearance. Hospital engineering staff should obtain records from the manufacturer, reports from the service group, and documentation of all significant overhauls. When a system is reconditioned, knowing if the system was done directly by the factory or if it was done by a 3rd party determines which replacement parts have been installed.
For complex diagnostic machines requiring specialist European industrial sub-assemblies, component tracing is especially important. In a reconstruction situation, technicians often have to recreate custom cabling assemblies that connect gantry sensors to core processors. Sourcing documents should verify that technicians purchased original wire harness in Finland from a Nordic engineering approved supplier or used an unverified after-market harness. Unrecorded wiring substitutions can cause intermittent communication problems between detection arrays and processing units, which are often hard to track down subsequently.
Moreover, each asset should have verifiable de-installation logs. Equipment that is imagined and/or removed from the operating room without adequate lock-out brackets and environmental controls during transport frequently incurs mechanical trauma that is not obvious. A decommissioning log shows if the hardware was packed as per the original manufacturer or if it was stripped down in a hasty manner by the liquidators.
Electrical power and internal wiring
One of the highest risk categories for pre-owned capital equipment is electrical integrity. The actual age of the device when viewed from the inside is the electrical distribution system, though the external chassis panels may be repainted to appear pristine. Insulation resistance testing should be performed on all of the main power rails for biomedical engineers.
High draw systems fail over the course of years of daily clinical duty cycles due to thermal stress. Very large imaging systems such as cath labs, angiography suites, and computed tomography (CT) scanners have a physical high voltage wiring harness with power from the primary generator to the tube assembly that must be inspected in detail.
- Micro cracking of the outer jacket
- terminal carbonisation
- weeping of the dielectric fluid
- mechanical pin relaxation
Should be checked at each terminal block by technicians. A worn-down harness in a high power circuit produces high electrical noise, poor image reconstruction and can lead to catastrophic arc faults that can damage sensitive detector banks.
Electrical validation must be conducted with the same attention to detail as grounding integrity. Surge damage is often found on the inside of devices that were pre-owned in facilities with poor power conditioning in those facilities. Testing ground leakage current at peak load verifies the equipment meets patient safety standards prior to clinical trial run.
Sub-tier sourcing and modular replacements
Refurbished systems can only be as reliable as the wear item that they are supplied with. Prior to purchasing agreement, biomedical directors need to know who makes the consumable modules, replacement interconnects, and hydraulic lines. Third-party rebuilders need to demonstrate they have access to validated replacement parts if the model line was discontinued by the original vendor.
Many mechanical assemblies used in European radiation therapy or surgical positioning hardware have parts that come from dedicated regional production clusters. For example, in the case of an articulated robotic arm or patient table, the precision wire harness in Italy will be purchased from a good electromechanical contractor that will ensure a flex life and shield signal transmission through the moving joints. When considering the use of refurbished motion rated cable assemblies, hospital procurement should inquire directly from the refurbisher where they can get them, particularly for systems that perform hundreds of repetitive articulating cycles each week.
In addition to cabling, hospitals should plot replacement pipelines for printed circuit boards, power supplies and vacuum parts. If a legacy scanner’s driver board goes bad and it takes four months to find it on the secondary market, there’s no real savings from a vendor who is selling the scanner for a deep discount. A binding commitment for parts availability for at least 5 years after delivery should be secured from the buyer.
Software licensing and cyber upgrades are available
Refurbished software is essentially worthless without a legal, working copy of the software. A lot of people who resell their computers later realise that proprietary operating systems, image processing programs, and enhanced diagnostic suites won’t go with the sale. Manufacturers regularly make application software non-transferable and require high relicensing fees before the software can be used in its entirety.
The other operational challenge is cybersecurity. Equipment that has been out of use for many years is likely to be operating on an outdated operating system that won’t support the latest network patches. The device’s software build should be audited by clinical engineering teams to ensure it meets secure network authentication, encrypted data transfer and standard anti-malware protection. Without secure access to the hospital picture archiving and communication system, the usefulness of a machine is significantly reduced.
There is also a need to clarify the access to services through keys. Some manufacturers place diagnostic software behind digital access keys that expire annually, or require dealers to have an active service contract. Procurement teams should either require permanent access to the administrative system or verify that local technicians are able to perform typical calibration sequences without vendor-specific remote access.
Acceptance testing and warranty terms for refurbished medical equipment
Do not buy used clinical equipment solely from bench tests performed at the refisher’s shop. Misalignments are commonly caused by transit vibration, temperature changes and reassembling on site. The final purchase contract should make the final payment dependent upon successful on-site acceptance testing in the hospital’s own clinical suite.
Biomedical personnel should conduct and repeat the same phantom, dose and mechanical stress testing for several days. These validation runs verify that radiation output meets regulatory calibration curves, acoustic profiles are within normal limits and emergency stop circuits react immediately. This is a critical window for establishing an operational baseline for performance that will serve as a reference point for future cycles of preventative maintenance.
Warranty terms must also be well-defined. Typically, a ninety-day parts warranty is not sufficient for a hospital because it does not cover travel charges, labour and other important consumables such as tubes and detectors.
- Include full replacement costs in the negotiation of warranties
- set guaranteed technician response times on-site
- include definite uptime requirements for initial operation
Takeaway
Warranty terms must also be well-defined. Typically, a ninety-day parts warranty is not sufficient for a hospital because it does not cover travel charges, labour and other important consumables such as tubes and detectors.